View Single Post
  #2  
Old 08-14-2013, 04:07 PM
Skip Skip is offline
Senior Member
 
Join Date: Nov 2009
Posts: 1,114
Default

Quick update:

We tore out all the old studs and reframed the walls properly.

Insulation was installed and new green board drywall put up.

New door was fitted to bedroom and crown molding installed.

Hope to paint Saturday and put floor down Sunday.

Here's a link with some details.


http://www.capitalgazette.com/projects/after_the_crime/
Reply With Quote